Who we work for

Sectors

Six kinds of clients, each with the work we have on record for them. Point at a sector to see where it took us on the island.

Municipal boundaries: Puerto Rico Planning BoardOne dot per municipality with work on record

Housing & Community Development

A building on the site of the Community Resilience Center in Loíza
Resilience center · Loíza
Our specialist, in the firm’s pink vest, inspects a building in Cataño
Site inspection · Cataño
Multifamily buildings during a green-building verification visit in Arroyo
Green verification · Arroyo

Most of our HUD Part 58 reviews are for housing and community projects paid with CDBG-DR and CDBG-MIT funds. Through AVA Green we also verify new housing to the National Green Building Standard.

Programs and rules

  • 24 CFR Part 58
  • CDBG-DR
  • CDBG-MIT
  • NGBS ICC 700
  • LEED

Services we bring

Work on record

  • Community Resilience Centers in nine municipalitiesCDBG-DR City Revitalization · 2025 to presentPart 58 environmental reviews for Álvarez Díaz & Villalón and the municipalities, with PRDOH as Responsible Entity.
  • José Gautier Benítez elderly and multifamily housingNGBS ICC 700 · 2020 to 2023NGBS verification of 438 apartments in 41 buildings for McCormack Baron Salazar.
  • Homes rebuilt under PRDOH’s housing programsNGBS ICC 700 · 2020 to 2025Home-by-home green verification visits and certification filing for builders in the CDBG-DR home repair and reconstruction program.
  • Caminos del Valle housing developmentCDBG-MIT housing · 2024 to 2026Part 58 Environmental Assessment, floodplain notices and USFWS consultation.

Healthcare Facilities

Our specialist photographs the sign of a propane tank at a hospital campus in Jayuya
Tank survey · Jayuya
An emergency generator at a hospital campus
Emergency generator
An above-ground diesel tank recorded during a tank survey
Fuel storage

Hospitals are adding chillers, water wells, generators, fuel tanks and emergency-room space with funds from PRDOH’s CDBG-MIT Infrastructure Mitigation Program – Healthcare. We prepare the level-of-review determination and the environmental review record for each project, and we plan our site visits around the hospital’s operations.

Programs and rules

  • 24 CFR Part 58
  • CDBG-MIT Healthcare
  • 24 CFR 51 Subpart C
  • Clean Air Act Title V
  • SPCC

Services we bring

Work on record

Energy & Utilities

Our specialist, in the firm’s pink vest and hard hat, walks a site with the crew in Aibonito
Field visit · Aibonito
A structure of an electric distribution line seen during a field inspection
Distribution line
A silt fence installed beside a work area in Utuado
Erosion control · Utuado

Since 2022 our biologists have inspected vegetation-management and repair work on transmission lines and distribution feeders for Puerto Rico’s electric grid operator, for protected species and erosion control. For microgrid, storage and EV-charging projects funded by CDBG-DR and CDBG-MIT we prepare the environmental reviews.

Programs and rules

  • FEMA EHP
  • ESA Section 7
  • CDBG-DR ER2
  • CDBG-MIT IPG
  • EPA Construction General Permit
  • LEED

Services we bring

Work on record

  • Environmental services for the electric gridBy work order · June 2022 to June 2027Agreement with Puerto Rico’s electric grid operator, extended twice. Biological inspections before crews clear vegetation, drill or repair; erosion-control inspections; coordination through FEMA’s environmental and historic preservation process.
  • BD Humacao Microgrid Energy SystemCDBG-DR ER2 · 2024 to presentLevel-of-review determination and Environmental Assessment, with wetlands screening and a flora and fauna study.
  • EV charging and energy storage station networkCDBG-MIT IPG · 2024 to presentScreening of candidate station sites and level-of-review determination for Transporte Sonnell.
  • Solar and power generation projectsCDBG-DR ER2 · 2024 to 2026Part 58 Environmental Assessments, a Phase I assessment and a LiDAR karst study for energy projects in Hatillo and Bayamón.
  • Erosion-control plan inspections for Puerto Rico’s public electric utility2020 to 2021Inspection of erosion and sedimentation control plans on the utility’s works.
  • PREPA Networks building — LEED certified, 2017AVA + FERPOLEED · CIAPR awardLEED administration by AVA and inspection of all trades by FERPO Consulting. Outstanding Environmental Engineering Project, College of Engineers and Surveyors of Puerto Rico.

Municipalities & Public Agencies

The PR-180 road in Salinas, reviewed for an evacuation-route improvement project
Evacuation route · Salinas
Pipe installation works inspected by FERPO Consulting in San Juan
Inspection · San Juan
The site of a municipal community center under environmental review in Arroyo
Municipal site · Arroyo

Municipalities come to us for the environmental review their CDBG-DR projects need. Agencies and public corporations hire our sister firm, FERPO Consulting, P.S.C., to inspect and manage construction and to keep federal funds in compliance.

Programs and rules

  • CDBG-DR City Revitalization
  • 24 CFR Part 58
  • Section 106
  • FEMA Public Assistance
  • 2 CFR 200
  • ARPA

Services we bring

Work on record

  • Municipal projects under the City Revitalization ProgramCDBG-DR · 2022 to 2025Part 58 reviews prepared through each municipality’s design engineer: the PR-180 evacuation route in Salinas, the Felisa Rincón de Gautier plaza in Ceiba, a roundabout and streets in Caguas, a park in Río Grande, plazas in Maunabo, Gurabo and Utuado, and lighting in San Sebastián.
  • Municipality of San Juan — designated construction inspectorsFERPO ConsultingMunicipal capital projects · 2024 to 2027Daily inspection at the municipal hospital, a diagnostic and treatment center, pipe installations and plaza rehabilitations.
  • Puerto Rico Department of Justice — project management of a building rehabilitationFERPO ConsultingARPA · 2023 to presentOwner’s representative, from design review and cost estimate through the formal bid and construction.
  • COR3 and the Public-Private Partnerships AuthorityFERPO ConsultingFEMA funds · 2021 to presentSingle Audit evaluations of FEMA-fund subrecipients, and financial consulting.
  • Puerto Rico Highways and Transportation AuthorityFERPO Consulting2023 to 2027Evaluation and update of the finance area’s regulations and procedures.
  • Public Buildings AuthorityFERPO Consulting2020Structural evaluations of public buildings after the January 2020 earthquakes.

Private Development & Industry

Our specialist, in the firm’s pink vest, walks a project site in Toa Baja
Site visit · Toa Baja
Tree canopy beside a project site, seen from a drone
Drone survey

A private project that receives CDBG-MIT or CDBG-DR funds needs the same Part 58 review as a public one. We also prepare Phase I site assessments and the environmental documents Puerto Rico’s permit process asks for.

Programs and rules

  • 24 CFR Part 58
  • CDBG-MIT IPG
  • CDBG-DR IPG
  • Phase I ESA
  • Puerto Rico environmental documents

Services we bring

Work on record

  • Thermo WarehouseCDBG-MIT IPG · 2024 to presentPart 58 Environmental Assessment with exhibits, contamination analyses and a LiDAR sinkhole study.
  • Convention District Financial & Innovation Center / FirstBank headquartersCDBG-DR IPG · 2022Project description and level-of-review determination, through Álvarez Díaz & Villalón.
  • Technology Partners, Único (Cabo Rojo), Ashford 1357, Bahía Urbana and Ponce de León 55CDBG-MITPart 58 reviews for privately developed projects.
Closed depressions found in a 1 m LiDAR terrain model of a project site in the northern karst, coloured by depth. Data: USGS 3DEP, 2024.
LiDAR · closed depressions
Closed depressions found in a 1 m LiDAR terrain model of a project site in the northern karst, coloured by depth. Data: USGS 3DEP, 2024.

Infrastructure & Natural Resources

Turbidity curtain and riprap at the Río de la Plata flood-control works
Flood control · Río de la Plata
Channel earthworks under the bridge at the Río de la Plata
Channel earthworks
Silt fence along the Río de la Plata flood-control works
Silt fence

Flood-control, sewer and road projects are built in and beside rivers, wetlands and habitat. We obtain the permits, write the erosion-control and stormwater plans, and inspect the works while they are built.

Programs and rules

  • EPA Construction General Permit
  • SWPPP
  • Erosion-control plans
  • USACE permits
  • ESA Section 7

Services we bring

Work on record

  • Río de la Plata flood controlPRHTA and USACE works · 2019 to presentFor the contractor, Construcciones José Carro: the permits, the erosion-control plan and the stormwater plan, and a compliance inspection every month since July 2019.
  • Roosevelt Roads sanitary sewer line and pump stationPRASA · 2015Environmental document, flora and fauna study and preliminary wetland evaluation.
  • PR-180 evacuation route and roundaboutCDBG-DR · 2022 to 2023Part 58 review with floodplain analysis and agency consultations for the Municipality of Salinas.

Contact Us

Ready to work with us? Let’s talk.

Tell us about the site, the funding program and the deadline. The principals answer, in Spanish or English.

Location
San Juan, Puerto Rico 00926
Service area
Puerto Rico · engineer licensed in Puerto Rico, Florida and North Carolina