The challenge
A flood-control project reshapes a river: channel excavation, a levee, scour protection and the relocation of utilities, all next to the water it is meant to control. Every one of those activities needs a permit before it starts and has to keep sediment out of the river while it lasts — under the eyes of Puerto Rico’s Department of Natural and Environmental Resources and the U.S. Army Corps of Engineers.
What we did
- Permits before the work. We prepared the environmental protection plan and obtained the permits for channel excavation, the levee, scour protection and utility relocation, including the consolidated general permit and its renewals as the project moved from one phase to the next.
- Erosion and sediment control. We prepared the erosion and sedimentation control plan and the stormwater pollution prevention plan the contractor works under.
- Monthly inspections. Since July 2019 we have inspected the works month after month to check the controls — silt fences, turbidity curtains, stabilized entrances, dewatering — and to record what we found with dated photographs.
- One point of contact. We keep the compliance record and the agency reports, and act as the liaison between the contractor, PRHTA and the agencies.
Results
The works have advanced with their environmental record kept up to date: more than sixty monthly inspections documented and more than 2,700 inspection photographs on file, each visit reported to the contractor.
From the field